The Wharf House restaurant was very busy during
the Christmas period |
 |
|
To visit The
Wharf House web site... |
The
Wharf House |
|
For bookings, telephone |
01452 332900 |
|
The turn of the year saw us working in the Wharf
House annex - which will be the disabled bedroom and boiler room.
Here you see the bedroom being divided from the boiler-room. |
 |
 |
|
Cutting and then gluing the skirting in a bedroom |
 |
 |
|
Painting the Annex windows and improving the
beading on a bedroom door |
 |
 |
|
The space under the eaves is being used to
build-in wardrobes |
 |
 |
|
Installing outside lighting has made the approach
to The Wharf House much more pleasing during the evenings |
 |
 |
| |
 |
|
|
A
misty, frosty view of the car park in mid winter |
 |
| We decided that for the
2006 Open Days we would produce a new set of smart signs to help visitors
appreciate the history of the site. Production took several weeks in early
summer. |
 |
|
|
Summer was well
advanced this year by the time we tackled the grass cutting around the car
park and below The Wharf House. Quite a task! |
 |
 |
|
The weedcutter boat
proved useful through the summer |
 |
 |
|
The weedcutter in
action with BBC Radio Gloucestershire's outside broadcast van in the
background at an Open Day |
 |
|
For much of the summer
we had two resident swans - Rudolph and Margot |
 |
 |
|
Members of the
Gloucester & District Model Boat Club at the dedication of their splendid
new bench in September |
 |
 |
In September we started to improve the
entrance to Over Basin. The area between the pavement and the Bailey bridge
has been re-profiled, and edging blocks have been laid ready for laying
paviors. The excavator in the background is re-profiling the path down to
the water and making it more wheelchair friendly.
(Sorry about the red hue to the pictures!) |
 |
 |
|
Progress on the wall and with re-laying
the path from the terrace. |
 |
 |
|
The large buried box will enable us to
install a telescopic bollard to prevent unwanted traffic entering the site. |
 |
 |
|
Profiling the entrance ready for laying
paviors. |
 |
|
Laying paviors between the pavement and
the bridge and on the path from the terrace. |
 |
 |
|
Cutting paviors to fill in the edges. |
 |
 |
|
Progress on the paths and wall. |
 |
 |
|
Progress to mid November. |
 |
 |
| |