OVER BASIN
from the Air |

|
|
JANUARY
Work being done at the front of the Wharf House
for the instillation of the services. |

|

|
|
FEBRUARY 5th
Work being done on the car park |

|

|
|
FEBRUARY 19TH
Fixing
the seating around the
Commemorative Wall |

|

|
|
MARCH 12th
Work Progressing on the Car Park |

|

|
|
MARCH 12th
Tree planting in
the Wood |

|

|
|
APRIL 16th
Trying out the new Strimmer and the Wheeled
Strimmer |

|

|
|
Making safe the Top of
the Stilling Chamber.
Marking out the line for the Paving in
front of the Wharf House |

|

|
|
Fitting out the top
floor of the Wharf House |

|

|
|
|
|
|
OPEN DAY
APRIL 27th |
|
|
Visitors arriving in
the car park |

|

|
|
Artist at work at the
open day |

|

|
|
'Mr Maysey' on the
water and
the Model Boat Club |

|

|
|
Visitors on a Guided
Tour |

|

|
Canalware on sale and 'Mr Maysey',
the Trip Boat. |

|

|
|
WORK BEING
DONE FROM MAY ONWARDS |
|
|
Pipe laying out side the Wharf House
Stud Walling on the Top Floor |

|

|
|
The Radon Barrier on the ground floor
and the Floor Screed |

|

|
|
The Osier Bed and Pump Hill Road |
 |

|
|
The inside Walls
being built on the Ground Floor |

|

|
|

|

|
Laying a land drain at the side
of The Wharf House.Planting Laurel Bushes at the front of
The Wharf
House. |

|

|
The Paving edges around
The Wharf
House |

|
|
| |

|
|